In October 2018, final works for the opening of the mining site "Rubuļi" was completed - a connection to state motor road V-516 was constructed. The area of the mineral extraction site takes 4.83 ha and the estimated available sand stock in it is 107 thsd m3, while sand-gravel stock accounts for 381 thsd m3.
It is planned to start controlled production of mixtures of mineral substances at the mining site "Rubuļi" in accordance with the following standards:
At this facility, we offer the production of mineral materials and their mixtures according to the customer needs, taking into consideration the resources available at the site of extraction of mineral resources. Please contact Sales Specialist Inese Ēvele (tel. 29422349,